CELL: 903-918-7279
HOME: 903-986-2345
Email: cpnjrdukes@aol.com
RESUME
Objective
My
goal is to work for an aggressive developing oil company that will allow me to
utilize my skills set to manage and develop comprehensive drilling and
production operations from the initial drilling and completion phase through
stimulation to daily production and workover operations.
Work Experience
Present –
June 2007
Prepared
& implemented AFE’s & procedures for workovers, stimulation & CT
intervention for One Tech LLC from June 1 through June 10.
From
June 10 through the present, I have worked exclusively for
2007 - 2006
Energytec, Inc.
From
January 1 through March 18, I served as General Manager of Field Operations
directing drilling, workover and completion operations in five
Appointed
by Board of Directors to Vice President of Drilling and Production, effective
March 19, 2006. This scope of this position included budgeting, employment,
regulatory issues, HSE process implementation and formulation of company
policy. I served in this capacity until my voluntary resignation on May 31,
2007.
2005 - 2003
Prepared
& implemented AFE’s & procedures for completions, CT intervention,
production facility & pipeline installation for various clients, including
Chalker Energy Partners, in both sour
& sweet producing fields in East Texas, Central Texas and North Louisiana.
Monitored
& supervised turnkey drilling of
Supervised
vertical & horizontal multi-lateral underbalanced drilling, completion, coil
tubing, stimulation and wireline operations for Bridas Energy
Formulated
& supervised procedures for wireline & coil tubing intervention in
prolific sour gas well in Madison County, Tx for Redwood Energy Production.
Assisted in casing design & drilling program/completion procedure for
12,100’ prolific Rodessa sour gas producer in Madison County, Texas. Supervised
drilling & completion of same well for Redwood Energy.
February 2004
Star Insight, Ltd
Worked
as a team member on a “due diligence” assessment for drilling & production
operations of 8 Siberian fields for Moncrief Oil & Gas of Ft. Worth, Tx
through Star Insight, Ltd. (The Woodlands, Tx)
2003 - 1998, KPObv (ChevronTexaco JV)
Drilling & Workover
Superintendent,
Invoked Change of Control
terms after Chevron-Texaco merger to voluntarily take early retirement /
severance in May 2003.
Managed fishing, workover, sidetracking
and completion operations for 2 - 3 rigs in 17,000' gas field with 6% H2S &
CO2.
Provided technical specifications for fishing, R&S, downhole
workover/drilling tools for Integrated Services Contract tender.
Assisted in provision of technical specifications and equipment requirements
for 6 drilling & workover rigs tender.
Assisted in development and implementation of technical and on-the-job training
regimen for Kazakh nationals to meet company goals and commitment to the
Developed and implemented
performance measures and tracking system for rig and rig-less well operations.
Assisted in development of HSE, Emergency Response Plans and PTW system within
Well Operations.
1997 – 1994
Saudi Arabian Texaco Inc.,
Rig Superintendent, PNZ
Managed the workover/service and shallow drilling rig operations and contract
for 4 - 6 shallow rigs and related activities in sour fields in the Partitioned
Neutral Zone.
Implemented performance
measures and and tracking system for shallow well rig work.
Directed fishing operations of 177 sucker rod pump wells.
Supervised and implemented 40 workovers per year within budget constraints.
Supervised shallow drilling and water well drilling.
Implemented completion procedures of 11 new vertical and 3 new horizontal
wells.
Directed 5 side-tracking operations.
Assisted Petroleum Engineering with development of workover and completion
procedures and proposals.
Introduced and implemented fiberglass tubing production strings for ESP production.
Supervised 7 Rig co-ordinators (company men), Production/Drilling Tools yard
and 3 employees, Rod Pump Shop and 3 employees, ESP yard and Rig Contractor
Superintendent.
Responsible for developing tenders for shallow drilling and workover rigs and
rod pump parts and services.
Developed technical and on-the-job rig supervision training program for Saudi
and Kuwaiti nationals .
1994 – 1992
Saudi Arabian Texaco Inc.,
Rig Supervisor, PNZ Kuwait
Supervised 2 - 4 workover/service rigs daily in
3 fields with sour crude production.
Supervised fishing and reactivation of 56 ESP
and 70 rod pump wells.
Supervised and executed completion of 2 wildcat
wells (14,500') at average cost of $2.5MM.
Supervised and executed 20 workovers and 4
high-angle side-tracks per year.
Supervised well servicing of ESP and rod pump
wells.
1992 – 1991
Getty Oil Co., Production Supervisor/Well Control Specialist, PNZ Kuwait
On loan to Getty Oil Co. from TEPI New Orleans
Onshore Producing Division for supervision of well control and well capping due
to Gulf War destruction.
Hands on supervision and direction of well
control and well capping of 285 wells damaged during invasion of
Supervised fishing of 6 ESP and 10 rod pump
wells.
1991 -1990
TEPI Onshore Producing
Finance, Quality Coordinator/Internal Consultant, New Orleans
Implemented and co-ordinated the Onshore
Producing Division Quality assurance Process.
Introduced the QA process in 7 central locations
of Assets West. " Presented Team Leader Training to 150 persons across the
whole division in 3-day sessions from
Taught Team Member Training to 100 Persons in
1-day sessions across
Coached and consulted with 10 cross-functional
work groups in
1990 – 1988
Supervised production operations, well services
and workover operations for 8 fields in 5 southeast
Assisted in design and supervised workovers of
oil and gas wells from depths of 1,500' - 15,000'.
On loan to Drilling Department during drilling
of 3 horizontal Austin Chalk wells in
Developed and controlled budget of Sub Area in
conjunction with Field Engineer to improve profitability of 80% of properties.
Developed and implemented corrosion program and
tubular designs in conjunction with Field Engineer that reduced well pulling
costs by 35%.
1988 – 1986
TEPI Onshore Sour Lake Area,
Production Supervisor/Drilling Supervisor, Humble Sub Area
Served as special assistant to area manager
supervising deep workovers, occasional drilling activities on loan to drilling
department and production operations in and around metropolitan
Supervised workovers on 11 sour gas wells
ranging in depth from 14,000' - 17,000'.
Supervised foam-air deepening of 2 Austin Chalk
vertical producers in
Upgraded North Milton Gas Gathering System in
Supervised installation, start-up and
commissioning of amine gas sweetening plant for Langham Creek Field.
1986 – 1984
Texaco E&P Inc. Corpus
Christi District, Production Supervisor, Snook, TX Area Sub Area
Supervised production, well servicing and
workover operations in 5 producing fields in 6 counties in central
Team Leader responsible for directing and
developing Environmental Disaster & Contingency Plan for the Corpus Christi
District.
Team member of manpower rationalisation team
formed to re-organize Corpus Christi District after Texaco-Getty merger.
1984 – 1981
Getty Oil Southern E &
P, Drilling/Production Supervisor, Bay City & Bryan, TX
Supervised drilling of 32 Austin Chalk wells
(8,600' - 10,000'), 6 Buda-Georgetown wells (9,500' - 11,000') and 8 Woodbine
wells (8,500').
Supervised drilling, DST and P&A of
22,000'exploratory sour gas Sligo Reef prospect in Walker County, Texas.
Supervised frac jobs of 18 Austin Chalk wells.
Supervised construction of 20 tank batteries for
new wells in Burleson, Brazos and
Served as Unit Operator Co-ordinator for Bryan
Woodbine Field GOR testing in conjunction with the Texas Railroad Commission.
1981 – 1980
Getty Oil Kilgore Area,
Temporary Drilling/Production Foreman, Calvin, La
Supervised drilling, workover, production and
gas plant operations in the Calvin Field of Winn Parish, Louisiana and in the
Carthage Field in
Supervised drilling and completion operations of
4 wells with depth of 16,500' with SBHP of 14,000 psi and SBHT of 325 - 3750 F.
Supervised drilling and testing of 12,000'
exploratory well in
Supervised 24-hour workover operations of 5
wells with SBHP of 12,000 psi and SBHT of 325 - 3750 F.
Supervised 2 matrix acid jobs with surface
treating pressures approaching 10,0000 psi and 2 frac jobs using 100,000 pounds
of proppant with surface treating pressures of 15,000 psi.
1980 – 1979
Getty Oil Kilgore Area,
Gas Plant Operator/Roustabout,
Worked in construction of Calvin Gas Plant.
Performed routine maintenance of processing
vessels and systems.
Operated gas plant within prescribed operating
parameters.
Monitored and operated gas wells, safety shut-in
systems and gas gathering systems.
1979 – 1979
Fish Engineering, Pipe
Fitter,
1979 – 1979
Brown & Root Inc.,
Pipe Fitter,
1979 – 1978
Southwestern Material
& Supply, Sheet Metal Worker,
Worked in
Worked in Texas and Arkansas constructing iron
structure buildings, installing roofing systems and repairing tornado damaged
pre-fab buildings for coal fired power plants and paper mills.
1974 – 1973
Brown & Root, Inc, Pie Fitter’s Helper, Texas
Eastman, Longview, Tx
Worked as a pipe fitter’s
helper installing new polyethylene unit in Eastman Plant.
Education
1978 - 1977, Petroleum Engineering, Texas A & M University , College
Station, TX
1977 - 1977, Petroleum Engineering, Kilgore Jr. College, Kilgore, TX
1976 - 1975, Petroleum Engineering, Texas A & M University College Station,
TX
1975 - 1974, Oil & Gas Technology, Kilgore Jr. College, Kilgore, TX
1973 – 1973, Pre-pharmacy,
1972 – 1973, Pre-pharmacy,
Kilgore Jr. College,
Personal Data
DOB:
12/16/54
Marital
Status: married with 6 children ranging in age from 26 to 9 years old.
Hobbies:
hunting, fishing, horseback riding.