Resume of
Travis Craig
Work Experience
Thirty plus years in
petroleum industry. Utilized as company
representative on workovers/completions, proficient in downhole activities,
slickline/E-line work, packers, dual and single completions, coiled tubing,
four years in snubbing operations international and domestic. Surface production, wellhead to flow
stations. Rig/rigless
workovers/completions/recompletions with safety first and foremost.
Present – James E. Smith
& Associates, Inc.,
Completion
Consultant
E-Z Corporation, George
West,
Consultant
– Finish drilling well to TD, 14,350’, ran/cemented casing, log well with
Schlumberger, did frac job, later ran CBL and perforated well, put on
production.
Kerr
McGee,
Consultant -Fishing ESP, cable and 3/8” injection line with rig,
change tubing, ESP change out, completions.
Maritech
Resources
Consultant - GOM—P & A work as per MMS.
Consultant - GOM—Acidizing, Coiled Tubing, slickline, E-line, squeeze
perfs to P & A one zone.
Seeco
Inc.,
Consultant - Pump down bridge plugs in horizontal wells, multi-stage
horizontal fracs, plug drill outs, CBL’s, snubbing completions.
Consultant - E-line CIBP, cement, drill out, perforate for
production.
Aspect
Energy,
Consultant - Completions, tubing change out, ESP change out.
J. W.
Operating,
Consultant - Coiled tubing composite E-line plug drill outs after
multi-stage fracs on horizontal wells.
Wynn
Crosby Operating,
Consultant - Well completion, swabbing, freeze job, plugs, squeeze
job, E-line perforating.
Hall
Exploration,
Consultant - Free point, cut tubing, CBL and CIBP.
Consultant - GOM, coiled tubing clean out, E-line logging and
perforating for production, pumping “sandtrap” treatment for assisting
production from new perfs.
Jay
Petroleum, (Isramco-Jay),
Consultant - Gas well workover, e-line, fishing, washing sand,
Louisiana
Delta Oil Co.
Consultant - Inland water, flat barge, shale barge. Conversion of production well to salt water
disposal well. E-Line, Coil tubing, washing sand w/foam and N2.
Swift
Energy Co.,
Consultant (Lafitte,
Trilogy
Operating Company,
Consultant - Did CBL, perforated well, established injection rate,
then pumped 2,000 gallons 15% HCL acid, maximum
rate 10.6 bpm, prepare well for future 7 stage frac job.
Education
Some College
Slickline
H2s
OSHA
Packers
Completions
DuPont STOP Safety Program
Familiar with DIMS reporting system